DTEK Luhanska Thermal Power Plant
DTEK Luhanska TPP is based in Schastia town, Luhansk Oblast.
Current status
On 25 April, DTEK Luhanska TPP connected to the national United Power Grid via a 110-kV power line..
Employees: on average 84% of staff worked at the plant in September 2017.
Capacity utilization: In September 2017, the installed capacity utilization factor was 19.51%.
From September 2014 until present time, shells landed on DTEK Luhanska TPP more than 80 times damaging its buildings, facilities, equipment and power lines.
DTEK power engineers are regularly reconstructing the damaged facilities of the plant and the power units destroyed by shelling to restore power back to one million residents of Luhansk Oblast.
Last updated: October 2017