MMKI-3

Alternative railway route constructed in Mariupol

Illich Iron and Steel Works and Azovstal completed the construction of the alternative railway route bypassing the bridge over the Kalchyk river destroyed in a terrorist attack, and re-established railway connection between the seaport in Mariupol and Mariupol-based steel enterprises.
Illich Iron and Steel Works and Azovstal funded repairs and provided rail products. The alternative railway route has been built jointly with Ukrzaliznytsia.

AKHZ 2

AKHZ shelled and damaged

Shells landed on AKHZ and damaged equipment in desulfurization shop No.1 and the heating pipelines. Electric cables were also severely damaged. Several shells landed in the near vicinity of the administration building and amenity premises No.1 where shrapnel and blast blew out windows and doors.

AKHZ

Heavy artillery shelling of AKHZ

Heavy artillery shelling damaged two high-voltage lines powering AKHZ and destroyed railway access tracks at Avdiivka railway station. Donetsk filter station was cut off from power. AKHZ normal operations were disrupted as a result of significant damages caused to the railway tracks and the overhead railway system of Avdiivka.

АКХЗ Повреждения на заводе 1

AKHZ employees injured

Two AKHZ employees have been injured when shells hit the AKHZ infrastructure shop: a man suffered moderate injuries and a woman – skin-deep injuries.
The plant’s medical staff provided first aid to the wounded employees.
They were taken to the central municipal hospital and their lives are in no danger.

АКХЗ Повреждения на заводе

Heavy shelling hit AKHZ

Another heavy shelling hit AKHZ, injuring three employees and damaging the core equipment of the plant. All AKHZ resources are being used to bring the plant back to normal operations.

AKKhZ

AKHZ being repaired

AKHZ repair crews have repaired the equipment significantly damaged by shelling on 16, 17 and 18 January 2015.

The main shops are back in operation. The plant has resumed production.

KhTZ 3

Metinvest helps rebuild damaged houses

The ongoing hostilities and shelling damaged houses of more than 80 workers of Metinvest Group’s KhTZ. “Aid+Help” Humanitarian Center of the Rinat Akhmetov Foundation, Metinvest Group, KhTZ, its trade union and staff provided financial assistance to rebuild the houses and apartments of the plant’s workers.

More

АКХЗ Отдел кадров 3

AKHZ damaged by shells

The core equipment of AKHZ was damaged by shells and the plant had to suspend operations. To date, production of furnace coke has been resumed. No reports of any injured AKHZ employees.

АКХЗ Повреждения на заводе 1

Сore equipment of AKHZ damaged

Heavy shelling damaged the core equipment of AKHZ. One worker was killed and some people were injured. The plant’s workers are repairing the damage from the artillery shelling.

mak -emz

Shelling of Makiivka branch of YeMZ

The territory of Makiivka branch of YeMZ was shelled on 6 February. Projectiles hit the gas pipeline and set the coke gas pipeline on fire. As a result, all rolling mills stopped.

EMZ

Metinvest suspends operation of two plants

Metinvest Group decided to suspend operations at YeMZ and its Makiivka branch because of continuous military operations in Donbas and no railway connection in the non-government controlled area.

More

EMZ

Metinvest suspends operations of two plants

Metinvest Group decided to suspend operations at YeMZ and its Makiivka branch because of continuous military operations in Donbas and no railway connection in the non-government controlled area.

AKKhZ

AKHZ power supply restored

AKHZ and DTEK specialists managed to restore power supply to the plant by connecting it to two high-voltage lines Makiivka-AKHZ-1 and Makiivka-AKHZ-2.

mak -emz -2

YeMZ relaunched rolling business

As soon as pig iron and steel production was resumed YeMZ relaunched rolling business putting two mills at Yenakiieve and Makiivka back in operation. Mill 390 at Makiivka branch of YeMZ produced finished products again after a two-month downtime.

AKHZ3

AKHZ re-launches desulfurization shop No.1

AKHZ specialists managed to re-launch desulfurization shop No.1 suspended on 11 January as a result of damages caused by the hostilities. AKHZ workers conducted repairs within the shortest possible time and launched the shop as soon as the power supply was restored.

emz2

Metinvest resumed operations at YeMZ

Metinvest resumed operations at YeMZ, which started producing pig iron and steel. The plant launched blast furnace No.5 in the standard operating mode, was about to finish blowing in blast furnace No.3 and made several lots of cast billets.

AKKhZ

AKHZ tar processing shop is back in operation

After a long downtime caused by the hostilities a tar processing shop is back in operation. As a result, 100 people have kept jobs at the plant.

mak-emz-3

Steel rolling is fully resumed at Makiivka branch of YeMZ

Mill 150 at Makiivka branch of YeMZ was put back in operation after two months of downtime. The company fully resumed steel rolling.

АКХЗ Градирня после обстрела

AKHZ shelled again

Shells landed on AKHZ killing one worker and injuring two. Projectiles damaged the core equipment. One worker was killed and two got injured.
The staff are repairing the damage.

АКХЗ IMG_20150522_082536

AKHZ heavily shelled again

AKHZ was heavily shelled again. Over forty projectiles landed on the plant’s premises. None of AKHZ employees were killed or injured but the plant suffered extensive damage, in particular, at the coke and coal preparation shops. Also, four high-voltage lines powering AKHZ were damaged causing an immediate shutdown. The plant suspended coke production. The emergency stoppage did not lead to any negative environmental implications. No leakage of harmful substances and waste water discharge reported.

AKKhZ

AKHZ resumed operations

The repair crew restored electricity to AKHZ and repaired the equipment damaged by hostilities.

AKHZ relaunches desulfurization shop No.1

AKHZ staff completed repairing desulfurization shop No.1 and resumed operations and production.

АКХЗ Повреждения на заводе 1

AKHZ shelled

On the night of 11-12 July, AKHZ (Metinvest Group) was heavily shelled. Two employees got injured.

AKHZ

AKHZ resumes operations

On 17 July, the plant’s specialists charged batteries of coke shops No.3 and No.4. Thus, seven coke batteries are being used for production, with the eighth coke battery under repair. Also, desulfurization shop No.2 and collection shop No.2 were recommissioned after a long downtime.

metinvest

Mariupol-based Illich Iron and Steel Works and Azovstal are restoring the railway bridge over the Kalchyk

Mariupol-based Illich Iron and Steel Works and Azovstal are restoring the railway bridge over the Kalchyk river between Sartana and Mariupol stations, blown up in a terrorist attack in December 2014. The reconstruction will ensure smooth operations of the steel plants and enhance the safety and convenience of passenger transportation in the region. Reconstruction will take three months and cost UAH 12 million.

AKHZ 2

Heavy shelling of AKHZ

Shells landed on AKHZ damaging the core equipment. None of AKHZ employees were injured.

AKKhZ

AKHZ close to shutdown

AKHZ was heavily shelled again. This time the shelling cut off power supply and damaged the plant’s railway infrastructure. None of AKHZ employees were killed or injured.

akhz

AKHZ completed repairing the facilities damaged during the shelling on 4 August

The plant resumed operations according to the planned target. DTEK and AKHZ specialists restored electricity to the plant by repairing the high-voltage lines. To date, seven coke batteries are in operation, with one under repair. The plant produces 6,900 tonnes of gross coke per day.

More

КДУ УМДРГШО_2

Makiivka branch of YeMZ was shelled

Projectiles damaged the rolling stock, a gas pipeline and power networks. The main equipment was not damaged. A railway shop worker was shell-shocked. He received medical treatment and his life was in no danger.  The company’s workers continued repairs. The plant operates as normal.

 

КДУ УМДРГШО_2

Makiivka branch of YeMZ was shelled

Projectiles damaged the rolling stock, a gas pipeline and power networks. The main equipment was not damaged. A railway shop worker was shell-shocked. He received medical treatment and his life was in no danger.  The company’s workers continued repairs. The plant operates as normal.

11911729-1632861570303497-5403271608535140092-o

Avdiivka Coke restores residential buildings

Metinvest Group’s Avdiivka Coke has completed repairs of three multi-storeyed buildings. The plant provides construction materials to restore private houses and has already channelled about UAH 1.5 million.

Kurakhovskaya TES

Avdiivka Coke resumes production of electrode pitch

Metinvest Group’s Avdiivka Coke Plant commissioned a tar distillation shop and restarted an electrode pitch granulation and packing line.

More

AKHZ3

Avdiivka Coke to help retired employees survive the winter

Metinvest Group’s Avdiivka Coke will provide all retired workers of the plant with free coal. To this end, the plant has already allocated UAH 3 million and is ready to provide more if needed.

More

bridge

First rolling stock comes from Sartana station to Mariupol seaport

The first rolling stock has crossed the repaired railway bridge over the Kalchyk river on the way from Sartana station to Mariupol seaport. The bridge was blown up in a terrorist attack in 2014

MOST

Metinvest reopens railway bridge over the Kalchik River

Metinvest Group reopened the railway bridge over the Kalchik River between Sartana and Mariupol stations, which was blown up in a terrorist attack in December 2014.

More